Jack-In Piling for Slope Protection Works in Lorong Rashidah Utama 1/3, SerembanJack-in pile or sometimes is called injection pile has been adopted in Malaysia since early 1990s. This type of piling approach is...
Aug 30, 2022Maintain Load Test (MLT) for Slope Protection Works in Lorong Rashidah Utama 1/3, Seremban