Dynamic Load Test (PDA) for Slope Protection Works in Lorong Rashidah Utama 1/3, Seremban
The second pile test conducted on the slope protection project in Lorong Rashidah Utama 1/3, Taman Rashidah Utama, Seremban, Negeri...
Maintain Load Test (MLT) for Slope Protection Works in Lorong Rashidah Utama 1/3, Seremban
The slope protection works in Lorong Rashidah Utama 1/3, Taman Rashidah Utama, Seremban, Negeri Sembilan Darul Khusus involved Jack-in...